Xero Energy was commissioned to perform a constraint analysis for the Twentyshilling Wind Farm project.

This constraint analysis was a quantification of the expected lost generation due to the constraint conditions outlined in the Twentyshilling Wind Farm grid connection offer.  Xero Energy used a power systems model of the grid together with data on faults, maintenance and planned upgrades and background generation and demand to quantify expectations on lost generation.  This work enabled the project developer to make informed decisions about how to proceed with the project and how and when to connect to the grid.